Manufacturing Process

From material receipt to finished product, our workshop follows structured steps that support consistent FRP and steel fabrication work for customer projects.

Incoming Inspection

01

Incoming Inspection

Materials and purchased parts are checked against project requirements before they enter production, so work can proceed with confirmed inputs.

Gel Coat Application

02

Gel Coat Application

Gel coat is applied in the hand lay-up area to establish the surface finish and protect the laminate beneath.

Lamination

03

Lamination

Fiberglass reinforcement and resin are built up in layers according to the part design, with attention to lay-up sequence and workmanship.

Grinding & Deburring

04

Grinding & Deburring

Edges and surfaces are trimmed, ground, and deburred so parts meet the agreed appearance and handling requirements.

Assembly (When Required)

05

Assembly (When Required)

When a project calls for it, sub-assemblies and hardware are fitted together before the product moves to final checks.

Daily Mold Inspection

06

Daily Mold Inspection

Molds are reviewed as part of routine production care so surfaces and fixtures remain suitable for ongoing use.

Final Product Inspection

07

Final Product Inspection

Finished items are reviewed against drawings and agreed requirements before release for packing or shipment.

Discuss Your Manufacturing Requirements

Share your drawings and project context through our quote request form. We will review the information and respond with practical next steps.

Submit Quote Request